BellMont
  • Services
    • Civil and Structural Engineering
    • Heritage Buildings
    • Expert Witness Services
    • Waterproofing
    • Concrete Repair Investigations
    • Project Management
    • Rope Access
    • Design Building Practitioner
  • Our Team
  • Case Studies
    • Facade Case Studies >
      • Bondi
      • Marrickville
      • Darling Point
    • Heritage Buildings Case Studies >
      • Chinatown Gate Refurbishment
      • St Sophia Church
      • Holy Trinity Greek Orthodox Church
      • Fortune of War Hotel
      • Spectacle Island
      • Ashfield
    • Waterproofing Case Studies >
      • Neutral Bay
      • Mascot
      • Summer Hill
    • Structural Case Studies >
      • King Street Wharf
      • Rockwall Apartments, Potts Point
      • Kirribilli
  • Blog
  • BULLETIN
  • Accreditations and Suppliers
  • Contact us

BellMont Blog

Ultimo Sydney Campus Apartments , Broadway

19/12/2016

0 Comments

 
Picture
With some 40,000 cars passing by it on a daily basis, the heritage listed Ultimo City apartments are a Sydney Landmark many would recognise.
Due to worsening water damage through the rooftop planter boxes and terrace membranes, Bellmont were appointed to oversee the rectification of the waterproofing membrane. Whilst rectifying the problem was of paramount importance, due to the age and cultural significance of the building, we had to simultaneously oversee the resoration process to ensure that all works would maintain the aesthetic integrity of the building.
On initial review you could be forgiven for thinking this was a simple job, but there was one further complication. We had to ensure works were undertaken in a way which would minimise the disruption and displacement of the students who resided in the building.

Laying down the solution

Having reviewed all tendered applications, our role as superintendents was to oversee the removal of 4,000 square meters of faulty membrane, the resurfacing as required of the existing substrate and the application of a new water-tight membrane.
Our recommendation was the implementation of a highly specialised polyurea, spray applied membrane system which achieved the required waterproofing needed whilst also allowing for a rapid turn around.
The nature of the work meant we were regularly onsite to undertake progressive QA of the film build for both the primer coat and subsequently, the actual membrane itself.
0 Comments

    Archives

    December 2021
    November 2021
    February 2021
    August 2020
    March 2020
    February 2020
    January 2020
    December 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    June 2017
    May 2017
    December 2016
    October 2015
    September 2015
    March 2015
    May 2014
    March 2014
    November 2013
    October 2013
    July 2013
    November 2012
    July 2012
    April 2012
    June 2011
    March 2010
    August 2009
    March 2009
    October 2008

    RSS Feed

Picture
For More Info:
Phone: ​​02 9518 0775
​Email: info@bellmont.net

  • Services
    • Civil and Structural Engineering
    • Heritage Buildings
    • Expert Witness Services
    • Waterproofing
    • Concrete Repair Investigations
    • Project Management
    • Rope Access
    • Design Building Practitioner
  • Our Team
  • Case Studies
    • Facade Case Studies >
      • Bondi
      • Marrickville
      • Darling Point
    • Heritage Buildings Case Studies >
      • Chinatown Gate Refurbishment
      • St Sophia Church
      • Holy Trinity Greek Orthodox Church
      • Fortune of War Hotel
      • Spectacle Island
      • Ashfield
    • Waterproofing Case Studies >
      • Neutral Bay
      • Mascot
      • Summer Hill
    • Structural Case Studies >
      • King Street Wharf
      • Rockwall Apartments, Potts Point
      • Kirribilli
  • Blog
  • BULLETIN
  • Accreditations and Suppliers
  • Contact us