A blog by RAND Engineering & Architecture, DPC says: "A problem we encounter all too often is a board operating in a reactive as opposed to proactive mode. If you don’t know the condition and the life expectancy of your building’s systems, you’re just going to be chasing crises as they occur. More crises means higher costs, higher stress, and lower quality on every project you undertake." And we could not agree more. In this article, the building being expected isn't in too much strife but the property managers are wise enough to think ahead of the game and save them lots of heartache down the tracks. Suburb: ASHFIELD Date: 29/01/20 Project: Bellmont Facade Engineering inspected the facade condition of a unit building in Ashfield. The façade is generally in structurally adequate condition with a relatively small number of large concrete spalls evident in the slab edges of the balconies. Some minor “reinforcing bar ends” have corroded, and these will require repair also, but these are not considered to be a structural concern as yet. The extent of corrosion is generally considered to be quite small and it is therefore our recommendation that early intervention and repair would provide maximum benefit to the owners. Recommendation: - Concrete repairs to corroding steel reinforcement - Render repairs - Painting of slabs edges, balustrades and balcony soffits - Replacement of spitter pipes with larger ones to allow easier drainage with less blockage Status: COMPLETE. This issues of concrete spalling, corrosion, render/paint delamination and drainage/guttering works have been rectified. As a result of being proactive, they have avoided even bigger issues and costs for the future. Be smart like them, call BellMont today to book an inspection (02) 9518 0775.
0 Comments
Leave a Reply. |
Archives
December 2021
|