BellMont
  • Services
    • Civil and Structural Engineering
    • Heritage Buildings
    • Expert Witness Services
    • Waterproofing
    • Concrete Repair Investigations
    • Superintendent Services
    • Rope Access
    • Design Building Practitioner
  • Our Team
  • Case Studies
    • Facade Case Studies >
      • Bondi
      • Marrickville
      • Darling Point
      • Wollongong
      • Manly
      • Brighton Le Sands
    • Heritage Buildings Case Studies >
      • Chinatown Gate Refurbishment
      • St Sophia Church
      • Holy Trinity Greek Orthodox Church
      • Fortune of War Hotel
      • Spectacle Island
      • Ashfield
      • Rosebery
    • Waterproofing Case Studies >
      • Neutral Bay
      • Mascot
      • Summer Hill
      • Hurlstone Park
      • Rosebay
      • Lanecove
    • Structural Case Studies >
      • King Street Wharf
      • Rockwall Apartments, Potts Point
      • Kirribilli
      • Sydney Olympic Park
      • Surfers Paradise
      • Drummoyne
  • Accreditations & Suppliers
  • Blog
  • Contact

BellMont Blog

The Perks of Proactivity

29/1/2020

0 Comments

 
A blog by RAND Engineering & Architecture, DPC says:

"A problem we encounter all too often is a board operating in a reactive as opposed to proactive mode. If you don’t know the condition and the life expectancy of your building’s systems, you’re just going to be chasing crises as they occur. More crises means higher costs, higher stress, and lower quality on every project you undertake."
​
And we could not agree more. In this article, the building being expected isn't in too much strife but the property managers are wise enough to think ahead of the game and save them lots of heartache down the tracks.
​Suburb: ASHFIELD
Date: 29/01/20
Project: Bellmont Facade Engineering inspected the facade condition of a unit building in Ashfield.
The façade is generally in structurally adequate condition with a relatively small number of large concrete spalls evident in the slab edges of the balconies. Some minor “reinforcing bar ends” have corroded, and these will require repair also, but these are not considered to be a structural concern as yet.
The extent of corrosion is generally considered to be quite small and it is therefore our recommendation that early intervention and repair would provide maximum benefit to the owners.
Picture
Recommendation:
-       Concrete repairs to corroding steel reinforcement
-       Render repairs
-       Painting of slabs edges, balustrades and balcony soffits
-      Replacement of spitter pipes with larger ones to allow easier drainage with less blockage
​
Status: COMPLETE.
This issues of concrete spalling, corrosion, render/paint delamination and drainage/guttering works have been rectified.

As a result of being proactive, they have avoided even bigger issues and costs for the future. Be smart like them, call BellMont today to book an inspection (02) 9518 0775.
BEFORE The original spitter pipes were too narrow for effective drainage.
BEFORE Concrete spalling noted on several balcony soffits
BEFORE Concrete Spalling
BEFORE Slabs showing signs of concrete cancer.
AFTER Wider spitter pipes were installed to avoid blockage.
AFTER Steel in concrete slabs were treated then patched over.
AFTER Concrete Spalling rectified.
0 Comments



Leave a Reply.

    Archives

    December 2021
    November 2021
    February 2021
    August 2020
    March 2020
    February 2020
    January 2020
    December 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    June 2017
    May 2017
    December 2016
    October 2015
    September 2015
    March 2015
    May 2014
    March 2014
    October 2013
    July 2013
    November 2012
    July 2012
    April 2012
    June 2011
    March 2010
    August 2009
    March 2009
    October 2008

    RSS Feed

Picture
Phone: ​​02 9518 0775
​Email: [email protected]

 PO Box 273, Petersham NSW 2049

  • Services
    • Civil and Structural Engineering
    • Heritage Buildings
    • Expert Witness Services
    • Waterproofing
    • Concrete Repair Investigations
    • Superintendent Services
    • Rope Access
    • Design Building Practitioner
  • Our Team
  • Case Studies
    • Facade Case Studies >
      • Bondi
      • Marrickville
      • Darling Point
      • Wollongong
      • Manly
      • Brighton Le Sands
    • Heritage Buildings Case Studies >
      • Chinatown Gate Refurbishment
      • St Sophia Church
      • Holy Trinity Greek Orthodox Church
      • Fortune of War Hotel
      • Spectacle Island
      • Ashfield
      • Rosebery
    • Waterproofing Case Studies >
      • Neutral Bay
      • Mascot
      • Summer Hill
      • Hurlstone Park
      • Rosebay
      • Lanecove
    • Structural Case Studies >
      • King Street Wharf
      • Rockwall Apartments, Potts Point
      • Kirribilli
      • Sydney Olympic Park
      • Surfers Paradise
      • Drummoyne
  • Accreditations & Suppliers
  • Blog
  • Contact